What this document actually says

This is a price quote from Pacific Access Elevator dated May 8, 2026, for installing one Garaventa Artira inclined stair lift in Building C at the district's 277 Karen Way location. The lift is designed for wheelchair accessibility with a 660-pound capacity and includes a fold-down seat. The total cost is $59,698, which includes prevailing wage labor, equipment, materials, taxes, and a two-year warranty. The quote requires the district to complete all building construction, electrical work, and backing before installation can begin. Manufacturing lead time is 5-8 weeks. Payment terms include four installments: 10% on submittal delivery, 35% when released for production, 35% on shipment, and 20% on installation completion.

What this means for your family

This quote is for installing an accessibility lift at one of the district's school buildings, which will improve access for students, staff, and visitors who use wheelchairs or have mobility challenges. The lift ensures compliance with ADA requirements and makes the building more inclusive. Families with students who have physical disabilities will benefit from improved accessibility throughout the campus.